Author Topic: Cleveland: Downtown: Standard Building  (Read 467 times)

0 Members and 1 Guest are viewing this topic.

Offline SixthCity

  • Jeddah Tower 3,281'
  • *****
  • Posts: 1580
Re: Cleveland: Downtown: Standard Building
« Reply #30 on: December 18, 2014, 01:42:40 PM »
Standard Building, Drury Plaza, other Northeast Ohio projects win state tax credits for preservation

http://www.cleveland.com/business/index.ssf/2014/12/standard_building_drury_plaza.html#incart_river

Online KJP

  • Jeddah Tower 3,281'
  • *****
  • Posts: 45304
  • Rebuilding the cities that built America.
Re: Cleveland: Downtown: Standard Building
« Reply #31 on: December 18, 2014, 03:56:40 PM »
Win some and lose a big one: Cleveland-area preservation projects receive funding, Cincinnati takes main prize
By STAN BULLARD
Originally Published: December 18, 2014 2:06 PM  Modified: December 18, 2014 3:23 PM

Conversions of the old Cleveland Board of Education Building to a Drury Plaza Hotel, and of the Standard Building near Public Square to a mixed-use project with apartments, both received maximum $5 million state Historic Preservation Tax Credit awards from the Ohio Department of Development Services.

Renovation of the former Goodyear Tire & Rubber Co. headquarters building in Akron to residential, office and institutional use, also received a $5 million allocation, the state said in an announcement today, Thursday, Dec. 18.

Industrial Realty Group, the developer of the Goodyear project, had applied for both a $5 million allocation and for a $25 million in the state’s new, larger program for project with catalytic economic impact.

MORE:
http://www.crainscleveland.com/article/20141218/FREE/141219830/win-some-and-lose-a-big-one-cleveland-area-preservation-projects
America will never be destroyed from the outside. -- Abraham Lincoln.

Offline sky

  • One SeaGate 411'
  • **
  • Posts: 305
Re: Cleveland: Downtown: Standard Building
« Reply #32 on: December 23, 2014, 11:40:38 AM »
I heard from a good source that full-on construction will start in June. 

Offline Confiteordeo

  • Burj Khalifa 2,722'
  • *****
  • Posts: 1050
Re: Cleveland: Downtown: Standard Building
« Reply #33 on: March 21, 2015, 12:25:00 PM »
You're right, they don't build class C space...downtown.  However, there is an oversupply of it in the burbs.  Hopefully the reduced class c space in the city doesn't drive these businesses to the suburbs.

And unfortunately, the Brotherhood of Locomotive Engineers and Trainmen is moving out of this building and to Independence...

Brotherhood of Locomotive Engineers and Trainmen to move HQ to Independence

Originally Published: March 20, 2015 4:21 PM  Modified: March 20, 2015 5:01 PM

Conversion of office buildings to apartments is about to cost downtown Cleveland the national headquarters of the Brotherhood of Locomotive Engineers and Trainmen, which has purchased an office building in Independence.

Through an affiliate, BLET Thursday, March 19, acquired for $1.8 million the office building at 7061 E. Pleasant Valley Road, according to Cuyahoga County land records.

BLET sold its 21-story Standard Building, 1370 Ontario St., July 1, 2014, to Warrensville Heights-based Weston Inc., for $3.9 million. Weston, an industrial and office building owner, plans to convert part of the multitenant office building to apartments and retain part of it as office space.

http://www.crainscleveland.com/article/20150320/FREE/150329969/brotherhood-of-locomotive-engineers-and-trainmen-to-move-hq-to

Offline gotribe

  • Jeddah Tower 3,281'
  • *****
  • Posts: 2592
Re: Cleveland: Downtown: Standard Building
« Reply #34 on: March 21, 2015, 01:00:13 PM »
I've been concerned that the shift of office to residential may drive some people to the burbs.  I know my building in independence is offering rents extremely cheap due to the vacancy rates along Rockside.  It's truly a "ghost town" there compared to what it was 10 to 15 years ago. 

Offline surfohio

  • Jeddah Tower 3,281'
  • *****
  • Posts: 6682
Re: Cleveland: Downtown: Standard Building
« Reply #35 on: March 21, 2015, 01:05:24 PM »
I've been concerned that the shift of office to residential may drive some people to the burbs.  I know my building in independence is offering rents extremely cheap due to the vacancy rates along Rockside.  It's truly a "ghost town" there compared to what it was 10 to 15 years ago. 

I've done some work in Independence. The only pro I can think of was seeing coyotes run across the parking lot every now and then.

Offline jmc8651

  • One SeaGate 411'
  • **
  • Posts: 396
Re: Cleveland: Downtown: Standard Building
« Reply #36 on: March 21, 2015, 02:36:28 PM »
It will be hard for downtown to retain some businesses which want to own their HQ. I believe the company that sold 75 Public SQ is also headed to Independence. Many suburban markets offer cheaper ownership opportunities.  However I think a lot of the displaced tenants will remain downtown. Many of these tenants are small litigation firms which value proximity to the courts. Plus there is still a ton of space downtown at the $15-16 dollar psf price point. 

Online KJP

  • Jeddah Tower 3,281'
  • *****
  • Posts: 45304
  • Rebuilding the cities that built America.
Re: Cleveland: Downtown: Standard Building
« Reply #37 on: March 22, 2015, 08:56:50 AM »
United Transportation Union already moved "outward" from downtown Lakewood to North Olmsted.

The Teamsters District Council HQ is just up the street from Independence, in Brooklyn Heights. And the BLE is part of the Teamsters as of a few years ago.
America will never be destroyed from the outside. -- Abraham Lincoln.

Online freethink

  • Jeddah Tower 3,281'
  • *****
  • Posts: 2032
Re: Cleveland: Downtown: Standard Building
« Reply #38 on: October 09, 2015, 09:31:50 AM »
Michelle had these from the meeting.

Michelle J. McFee ‏@mjarboe
Weston has no plans, at this point, to replace or mimic onetime "The Standard Building" sign on building's big, blank south face.

24h24 hours ago
Michelle J. McFee ‏@mjarboe
Weston exec estimates that developer will replace 1,320 windows in Standard Building north of Public Square as part of apartment conversion.

24h24 hours ago
Michelle J. McFee ‏@mjarboe
At a #CLE Landmarks Commission presentation re: Standard Building redo. Plans for 285 apartments. Addy's, PNC stay on ground floor for now.

I would consider using the wall as a video display. But the video 'mesh' type display that they used at the Cle Institute of Art. You see it used a lot in Time Square. They are much more energy efficient and less expensive than traditional video display. And they look great.

Offline msa1092

  • Huntington Tower 330'
  • **
  • Posts: 115
Re: Cleveland: Downtown: Standard Building
« Reply #39 on: October 10, 2015, 12:12:28 AM »
I always thought that huge blank wall would be great for a mural or advertising.

Offline dave68

  • Key Tower 947'
  • ****
  • Posts: 742
Re: Cleveland: Downtown: Standard Building
« Reply #40 on: October 10, 2015, 12:33:18 PM »
i wonder why the southern side never had windows. For a building, with such a prominent view from Public Square, I always felt the terra cotta details should have continued on the back.
« Last Edit: October 10, 2015, 10:01:40 PM by dave68 »

Online freethink

  • Jeddah Tower 3,281'
  • *****
  • Posts: 2032
Re: Cleveland: Downtown: Standard Building
« Reply #41 on: October 10, 2015, 10:00:16 PM »
^Yes that would have been nice. Or if the whole building could have been rotated 90° so the entrance would have been on Ontario. But it was not uncommon for buildings of that era to have a blank wall.  From what I recall when Weston bought the Standard it was mentioned that the buildings elevators are along the back wall so punching in windows was not feasible. Even if the historic tax credits allowed it. Our only hope is maybe the OldStone Parish building which is the structure just South of the Standard can be replaced one day with something taller. But that property has been in the churches hands for a long long time.

Online KJP

  • Jeddah Tower 3,281'
  • *****
  • Posts: 45304
  • Rebuilding the cities that built America.
Re: Cleveland: Downtown: Standard Building
« Reply #42 on: October 11, 2015, 09:33:11 AM »
i wonder why the southern side never had windows. For a building, with such a prominent view from Public Square, I always felt the terra cotta details should have continued on the back.

Because the part of the Standard Building that was built was Phase 1. There was consideration in the 1920s of demolishing the Old Stone Church, which was only 70 years old at that time, and constructing the Phase 2 office building in its place.

Any time you see a blank wall like that (Lebron mural wall at Landmark office tower, blank wall of The 9 facing Euclid Ave), it's an example of a construction phase that was never undertaken.
America will never be destroyed from the outside. -- Abraham Lincoln.

Online StapHanger

  • Jeddah Tower 3,281'
  • *****
  • Posts: 8446
Re: Cleveland: Downtown: Standard Building
« Reply #43 on: October 11, 2015, 12:23:48 PM »
^Did the Standard Bldg owners ever control the Old Stone Church lot? They may have an eye on a second phase, but the more usual reason for blank or "unfinished" building walls is that they face shared lot lines, so any windows (or fancy facade materials) are liable to be sealed up by by a future adjacent building, unless a developer owns both lots or controls the air rights over the shorter building. In most cities, lot line windows are permitted, but don't meet code requirements.
« Last Edit: October 12, 2015, 09:01:38 AM by StrapHanger »

Offline mrnyc

  • Jeddah Tower 3,281'
  • *****
  • Posts: 12870
Re: Cleveland: Downtown: Standard Building
« Reply #44 on: October 11, 2015, 12:43:53 PM »
there are sometimes unsightly/sometimes cool looking blank walls via neighboring teardowns as well.

Online KJP

  • Jeddah Tower 3,281'
  • *****
  • Posts: 45304
  • Rebuilding the cities that built America.
Re: Cleveland: Downtown: Standard Building
« Reply #45 on: October 11, 2015, 01:05:58 PM »
there are sometimes unsightly/sometimes cool looking blank walls via neighboring teardowns as well.

True. An example is the missing tooth between the Rockefeller Building and the Perry-Payne Building. But the building that was there predated the other two and was smaller than them as well.
America will never be destroyed from the outside. -- Abraham Lincoln.

Offline Whipjacka

  • Burj Khalifa 2,722'
  • *****
  • Posts: 1085
Re: Cleveland: Downtown: Standard Building
« Reply #46 on: October 11, 2015, 01:36:57 PM »
Maybe the expected the building between the church and the standard to be more than 3 stories tall

Online freethink

  • Jeddah Tower 3,281'
  • *****
  • Posts: 2032
Re: Cleveland: Downtown: Standard Building
« Reply #47 on: October 11, 2015, 11:24:41 PM »
^Did the Standard Bldg owners ever control the Old Stone Church lot? They may have an eye on a second phase, but the more usual reason for blank or "unfinished" building walls is that they face shared lot lines, so any windows (or fancy facade materials) are libel to be sealed up by by a future adjacent building, unless a developer owns both lots or controls the air rights over the shorter building. In most cities, lot line windows are permitted, but don't meet code requirements.

If you read the history of that space on the Old Stone website it doesn't sound like that property was ever in jeopardy of leaving the churches hands.  http://www.oldstonechurch.org/the-arts/history-architecture
Especially when the Standard Bank pretty much dissolved into two other banks not long after the building was constructed. And I can't find any evidence of a 'Phase 2' anywhere.

Online KJP

  • Jeddah Tower 3,281'
  • *****
  • Posts: 45304
  • Rebuilding the cities that built America.
Re: Cleveland: Downtown: Standard Building
« Reply #48 on: October 11, 2015, 11:54:32 PM »
And I can't find any evidence of a 'Phase 2' anywhere.


Except the blank wall facing a major city's public square and the bank of elevators not put in the center of the Standard Building, but rather placed on the other side of that blank wall. In archaeology, this is called a positive correlation. ;)
« Last Edit: October 11, 2015, 11:56:56 PM by KJP »
America will never be destroyed from the outside. -- Abraham Lincoln.

Offline ink

  • Global Moderator
  • Jeddah Tower 3,281'
  • *****
  • Posts: 6981
Re: Cleveland: Downtown: Standard Building
« Reply #49 on: October 12, 2015, 07:01:23 AM »
And I can't find any evidence of a 'Phase 2' anywhere.


Except the blank wall facing a major city's public square and the bank of elevators not put in the center of the Standard Building, but rather placed on the other side of that blank wall. In archaeology, this is called a positive correlation. ;)

It was very common that urban buildings built to a lot line (not talking right of way lot lines) would not have any windows or openings on the lot line facade. If you did not own additional land or an easement, another building could be built up against you at any time--and that was certainly a possibility when the Standand was built--so you set yourself up for the next guy in the block and put your elevators and windowless uses on the potential/future common wall. I am not sure how much they worried about fire back in those days--I assume they did--but today if you put windows in any building on the lot line, you may have to plan fireblocks or other mechanisms to prevent fire from jumping from your building to the next.

If the building was planned for an addition/phase 2, I think a good clue would be the floorplan and circulation. If the cooridors are stubbed or elevators/stairs are overbuilt capacity-wise, that might be a sign.

Online KJP

  • Jeddah Tower 3,281'
  • *****
  • Posts: 45304
  • Rebuilding the cities that built America.
Re: Cleveland: Downtown: Standard Building
« Reply #50 on: October 22, 2015, 09:46:02 AM »
Change of use request:

http://planning.city.cleveland.oh.us/bza/agenda/2015/crr11-09-2015.pdf

Board of Zoning Appeals
NOVEMBER 9, 2015

9:30
Calendar No. 15-229: 1370 Ontario Street Ward 3
Joe Cimperman
4 Notices
1370 Standard Building LLC, owner, proposes to change use of office building to 285 residential units
with ground floor retail, and exterior alterations to building including exterior façade, window and
roof replacement in an E5 General Retail Business District. The owner appeals for relief from the
following sections of the Cleveland Codified Ordinances:
1. Section 355.04(b) which states that in an “E” area district, the maximum gross floor area of a
residential building in any use district cannot exceed one & one half times the lot area. Lot
2 | P a g e
area of 22,676 square feet allows a maximum gross floor area of 34,014 square feet. The
gross floor area of the building is approximately 350,000 square feet.
2. Section 357.01(c) which states that rear and interior side yards are required for a residence
building in a General Retail Business District.
3. Section 357.08(b)(2) which states that a rear yard equal to one half the height of the building
is required none provided.
4. Section 357.09(b)(2)(C) which states that an interior side yard equal to one fourth the height
of the building is required none provided.
5. Section 341.02 which states that review and approval of the Cleveland Landmarks
Commission is required. (Filed October 12, 2015)
America will never be destroyed from the outside. -- Abraham Lincoln.

Offline ExPatClevGuy

  • Metropolitan Tower 224'
  • *
  • Posts: 141
Re: Cleveland: Downtown: Standard Building
« Reply #51 on: March 11, 2016, 09:25:04 AM »
In this screen capture from the Turner Hilton Webcam this morning, it looks like Construction activity on the upper floors of the Standard Building. 
Any news of such progress at this site?

Online KJP

  • Jeddah Tower 3,281'
  • *****
  • Posts: 45304
  • Rebuilding the cities that built America.
Re: Cleveland: Downtown: Standard Building
« Reply #52 on: March 11, 2016, 09:27:07 AM »
In this screen capture from the Turner Hilton Webcam this morning, it looks like Construction activity on the upper floors of the Standard Building. 
Any news of such progress at this site?

Good job! You can be a private detective any time you want! Nice job not paying attention to the obvious and instead noticing the not-so obvious!
America will never be destroyed from the outside. -- Abraham Lincoln.

Offline PoshSteve

  • Great American Tower 665'
  • ***
  • Posts: 695
Re: Cleveland: Downtown: Standard Building
« Reply #53 on: March 12, 2016, 01:04:49 PM »
Definitely doing something there. I noticed some large construction dumpsters out front along St Clair today

Offline sky

  • One SeaGate 411'
  • **
  • Posts: 305
Re: Cleveland: Downtown: Standard Building
« Reply #54 on: April 14, 2016, 08:01:01 PM »
Lots of new scaffolding around the building today!!

Offline stpats44113

  • Premium Member
  • One World Trade Center 1,776'
  • ***
  • Posts: 990
Re: Cleveland: Downtown: Standard Building
« Reply #55 on: April 14, 2016, 10:43:14 PM »
I saw that as well on my walk home from work.

Offline musky

  • Jeddah Tower 3,281'
  • *****
  • Posts: 5279
  • "Where there is no vision, the people perish..."
    • FB
Re: Cleveland: Downtown: Standard Building
« Reply #56 on: May 19, 2016, 09:19:07 AM »
Saw this on the west side ofthe building on Monday: three different-sized letters placed in weird spots. Anyone know what it means?

Online KJP

  • Jeddah Tower 3,281'
  • *****
  • Posts: 45304
  • Rebuilding the cities that built America.
Re: Cleveland: Downtown: Standard Building
« Reply #57 on: May 19, 2016, 10:10:15 AM »
Saw this on the west side ofthe building on Monday: three different-sized letters placed in weird spots. Anyone know what it means?

Alien navigational aids for their targeting systems.
America will never be destroyed from the outside. -- Abraham Lincoln.

Offline ArtMasterCLE

  • Dirt Lot 0'
  • *
  • Posts: 37
Re: Cleveland: Downtown: Standard Building
« Reply #58 on: May 19, 2016, 10:41:30 AM »
That's laugh out loud funny, KJP!!!
Thank you for that.

Offline CLE618

  • Kettering Tower 408'
  • **
  • Posts: 260
Re: Cleveland: Downtown: Standard Building
« Reply #59 on: May 19, 2016, 03:43:14 PM »
My guess would be that they are testing different sized letters for "The Standard" or something similar on the building.