UrbanOhio.com
November 21, 2009, 02:17:05 AM *
Welcome, Guest. Please login or register.
Did you miss your activation email?

Login with username, password and session length
News: We are in the middle of editing thousands of posts.  If you do not see your favorite thread, do not worry.  It will be back once cleaned.
 
   Home   Help Calendar Login Register  
Pages: 1 ... 85 86 87 88 89 [90]   Go Down
  Print  
Author Topic: Cleveland: Flats East Bank  (Read 316847 times)
0 Members and 1 Guest are viewing this topic.
Oldmanladyluck
574'-Carew Tower
*****
Offline Offline

Posts: 665



« Reply #2670 on: October 06, 2009, 09:22:00 AM »

Notice that the office tower in this first phase is 6-8 stories shorter than what was previously planned... thanks to the financial crisis.  Though we've debated on this forum the importance of street-level interactions, it would have been nice to see a new structure of some greater height being built.
jborger
examiner.com, twitter, blog
279'-First Energy Center
**
Offline Offline

Posts: 78


« Reply #2671 on: October 06, 2009, 09:43:09 AM »

Also if you go to the website http://www.flatseast.com it has been stripped down bigtime with what looks to be an updated rendering.


I'd be interested to see the back of that building and how it connects with West 9th Street.  I believe there's a parking lot there.  Will that remain or be an east entrance to the building?
Oldmanladyluck
574'-Carew Tower
*****
Offline Offline

Posts: 665



« Reply #2672 on: October 06, 2009, 09:49:40 AM »

Cleveland's City Council approves huge financial package to help revive Flats east bank project
By Henry J. Gomez, The Plain Dealer
October 05, 2009, 6:34PM

With Michelle Jarboe

Cleveland’s City Council threw a life raft Monday to private developers hoping to tackle a major real estate project along the east bank of the Flats.

Council members approved a substantial financial package, including a $30 million loan, that Mayor Frank Jackson proposed last month as part of city and state efforts to revive the recession-stalled plans. A $270 million first phase is to be anchored by a new office building to house the Ernst & Young accounting firm and the Tucker Ellis & West law firm.

http://blog.cleveland.com/metro/2009/10/clevelands_city_council_approv.html
X
Global Moderator
*****
Online Online

Posts: 3451

intriguing. beguiling. captivating. enthralling.


« Reply #2673 on: October 06, 2009, 10:35:01 AM »

Notice that the office tower in this first phase is 6-8 stories shorter than what was previously planned... thanks to the financial crisis.  Though we've debated on this forum the importance of street-level interactions, it would have been nice to see a new structure of some greater height being built.

My old site plan shows a 20 story building, and I estimate about 20 stories on the current rendering-it's hard to tell what's happening when it goes behind the other building.
KJP
Global Moderator
*****
Online Online

Posts: 6780


Hope is not a plan


« Reply #2674 on: October 06, 2009, 10:49:40 AM »

Seems about the same height to me.
Oldmanladyluck
574'-Carew Tower
*****
Offline Offline

Posts: 665



« Reply #2675 on: October 06, 2009, 10:50:19 AM »

^You're probably right... I just remember (or probably wanted to see) something larger on that site ;)
tedolph
279'-First Energy Center
**
Offline Offline

Posts: 85


« Reply #2676 on: October 06, 2009, 02:03:54 PM »

Also if you go to the website http://www.flatseast.com it has been stripped down bigtime with what looks to be an updated rendering.


I know that artists' renderings can be very misleading, but as such, this is very uninspiring.


Looks like a rendering from the 1950's
MyTwoSense
40+ and Fly
Premium Member
*****
Offline Offline

Posts: 11413


Living Large in Beautiful Shaker Square


« Reply #2677 on: October 06, 2009, 02:11:19 PM »

Also if you go to the website [url=http://www.flatseast.com]http://www.flatseast.com[/url] it has been stripped down bigtime with what looks to be an updated rendering.


I know that artists' renderings can be very misleading, but as such, this is very uninspiring.


Looks like a rendering from the 1950's

 
No it doesn't.  Honestly I like it, on paper.
w28th
771'-Terminal Tower
*******
Offline Offline

Posts: 1043


« Reply #2678 on: October 06, 2009, 02:21:20 PM »

A horrible rendering.  That is fact.
MyTwoSense
40+ and Fly
Premium Member
*****
Offline Offline

Posts: 11413


Living Large in Beautiful Shaker Square


« Reply #2679 on: October 06, 2009, 02:40:19 PM »

A horrible rendering.  That is fact.

You and are you professional opinion!  :P   he he he  ;)
MuRrAy HiLL
771'-Terminal Tower
*******
Offline Offline

Posts: 1089



« Reply #2680 on: November 03, 2009, 03:57:20 AM »

Strickland announces $1 million for Cleveland investments

"We are making strategic investments in Ohio communities and businesses to retain jobs and to advance urban redevelopment efforts," Strickland said.

Flats East Development LLC will receive a $1 million Rapid Outreach Grant for the costs associated with building construction in support of the company's redevelopment project in the City of Cleveland (Cuyahoga County).

MORE AT http://www.wkyc.com/news/state/ohio/news_article.aspx?storyid=124607&catid=23
Coneybear
256'-American Building
*
Offline Offline

Posts: 41


« Reply #2681 on: November 03, 2009, 04:56:26 PM »

Enough talk. Let's start building!
X
Global Moderator
*****
Online Online

Posts: 3451

intriguing. beguiling. captivating. enthralling.


« Reply #2682 on: November 03, 2009, 10:37:06 PM »

Construction doesn't start because there's been enough talk, it starts because there's enough money.
Coneybear
256'-American Building
*
Offline Offline

Posts: 41


« Reply #2683 on: November 03, 2009, 10:39:23 PM »

I know, but I've seen so much news of huge federal and state loans that this project has been receiving that it seems like they should have enough to at least start on something. But maybe I'm just too impatient.
MayDay
Administrator
*****
Offline Offline

Posts: 4539


The HBIC from the CLE


« Reply #2684 on: November 04, 2009, 07:57:54 AM »

I've driven by and they're doing a substantial amount of excavation all over the site; I'm pretty sure that's only for the infrastructure improvements for now.
KJP
Global Moderator
*****
Online Online

Posts: 6780


Hope is not a plan


« Reply #2685 on: November 04, 2009, 08:43:32 AM »

You drove?
McCleveland
Global Moderator
*****
Offline Offline

Posts: 1968



« Reply #2686 on: November 04, 2009, 09:29:13 AM »

I know, but I've seen so much news of huge federal and state loans that this project has been receiving that it seems like they should have enough to at least start on something. But maybe I'm just too impatient.

patience grasshopper.  i believe total of grants and loans is about $54m, and the initial phase of the development is in the $250-270m range.  As has been reported, they expect to have everything in order to begin by around the first of the year.
Coneybear
256'-American Building
*
Offline Offline

Posts: 41


« Reply #2687 on: November 04, 2009, 03:37:23 PM »

I know, but I've seen so much news of huge federal and state loans that this project has been receiving that it seems like they should have enough to at least start on something. But maybe I'm just too impatient.

patience grasshopper.  i believe total of grants and loans is about $54m, and the initial phase of the development is in the $250-270m range.  As has been reported, they expect to have everything in order to begin by around the first of the year.

yayay!! i really hope construction will start that early. And even if this get put off, the casino construction should keep me occupied. (i guess i really like the site of construction downtown)
mrnyc
1776'-Freedom Tower
**********
Offline Offline

Posts: 4963



« Reply #2688 on: November 04, 2009, 05:28:43 PM »

in the meantime, i'm glad to hear they are working on continual infrastructure improvements around there. very good of the city for now!
gotribe
629'-Rhodes State Tower
******
Offline Offline

Posts: 938


« Reply #2689 on: November 05, 2009, 02:10:24 PM »

I know the tower bids next Friday, November 13 for general trades.  It was supposed to go tommorow morning but was extended 1 week. It has been advertised as 23 stories, 18 floor office tower ontop of 3 story parking and 2 story penthouse for mechancial features.  CM was chosen a little while back.  All in all, it is very much alive and really close to going up. 

Also, the hotel bids next Friday, and is advertised as 8 stories with the first 3 floors as retail.  150 hotel rooms.
3231
Global Moderator
*****
Offline Offline

Posts: 3511


« Reply #2690 on: November 05, 2009, 02:37:13 PM »

^CM--what does that mean?
McCleveland
Global Moderator
*****
Offline Offline

Posts: 1968



« Reply #2691 on: November 05, 2009, 02:37:54 PM »

construction manager.
KJP
Global Moderator
*****
Online Online

Posts: 6780


Hope is not a plan


« Reply #2692 on: November 05, 2009, 02:46:08 PM »

I know the tower bids next Friday, November 13 for general trades.  It was supposed to go tommorow morning but was extended 1 week. It has been advertised as 23 stories, 18 floor office tower ontop of 3 story parking and 2 story penthouse for mechancial features.  CM was chosen a little while back.  All in all, it is very much alive and really close to going up. 

Also, the hotel bids next Friday, and is advertised as 8 stories with the first 3 floors as retail.  150 hotel rooms.

Gee, couldn't they just put the hotel on top of the office building and get a 31-story tower?   :-P

In all seriousness, I'm very glad to read this development. Hopefully it will spur more, especially on the Weston-owned properties in the Warehouse District.
gottaplan
256'-American Building
*
Offline Offline

Posts: 32

Sidewalk Superintendent extraordinaire


« Reply #2693 on: November 05, 2009, 09:09:44 PM »

I know the tower bids next Friday, November 13 for general trades.  It was supposed to go tommorow morning but was extended 1 week. It has been advertised as 23 stories, 18 floor office tower ontop of 3 story parking and 2 story penthouse for mechancial features.  CM was chosen a little while back.  All in all, it is very much alive and really close to going up. 

Also, the hotel bids next Friday, and is advertised as 8 stories with the first 3 floors as retail.  150 hotel rooms.

Is the new CM on the project Gilbane?  I know originally it was Marous Bros, but Wohlstein parted ways with them for whatever reason.  It'll be interesting to see what local contractors bid on & get the work.
Etheostoma Caeruleum
629'-Rhodes State Tower
******
Offline Offline

Posts: 758


The Cuyahoga River-Habitat for an amazing fish!


« Reply #2694 on: November 05, 2009, 09:47:01 PM »

Glad to see this moving, but one concern...I hope this added 'retail' doesn't make it even harder to fill existing space downtown.... Or, I hope it does not lure existing business out of existing places to locate in the new. That would be a kind of 'sprawl contained within downtown' scenario. Such will never have the appeal of a Euclid shopping area.
Pages: 1 ... 85 86 87 88 89 [90]   Go Up
  Print  
 
 

Powered by MySQL Powered by PHP Powered by SMF 2.0 Beta 3.1 Public | SMF © 2006–2008, Simple Machines LLC Valid XHTML 1.0! Valid CSS!